Rather than taking on the time-consuming and costly option of digging out, hardcoring and re-instating temporary roads, as well as running the risk of cross-contamination, why not consider the use of a temporary construction site road surface as a solution? We can have 1 kilometre of trackway installed and ready to use within 24 hours of arrival on site and removed just as quick. No need to reinstate and very little if any disturbance to the sub-soil.
We can also provide “weight load reducing crossing areas” where there may be underground pipes or cables.
All of our site engineers are trained to the highest standards and health and safety are always top of the list.
WE CAN PROVIDE:
- Temporary Site Access Roads
- Site Compounds / Lay Down Areas
- Temporary Car Parks
- Crane Pads